The courtyard houseIllustrative edition · November 2026
Fictional property. Illustrative study. All property details, dimensions, costs and scenarios are invented for this example. No address, parcel records, zoning permission, official approval or professional conclusion has been verified.

The starting point

The courtyard house

This invented study starts with a single-story house on a rectangular lot and a generous rear garden. The owner's goal is a separate long-term rental, with privacy for both households. No real address, parcel or jurisdiction is represented.

Concept diagram only. Not to scale. Boundaries, setbacks and proposed uses are not verified.

Lot
6,000 sq ft, assumed
Existing home
1,400 sq ft, assumed
Study concept
600 sq ft detached unit
Location
Fictional, no jurisdiction

The question being investigated

Could a separate, roughly 600 sq ft home fit behind an existing house while preserving useful outdoor space and independent access?

Possible scenarios

Alternatives to investigate, not approved or recommended designs.

Keep the garden

No new floor area

Retain the current use. Investigate maintenance or landscape improvements separately. This is the baseline against which to compare cost, privacy and disruption.

Compact second home

600 sq ft concept

Explore a one-bedroom detached unit with a separate path. A smaller footprint may leave more garden, but this sketch establishes neither a legal building envelope nor permission to rent.

Smaller flexible space

400 sq ft concept

Ask whether a smaller layout could serve the owner's goals. A non-dwelling studio and a legal dwelling have different requirements. Do not assume one can be used as the other.

Needs verification

Physical & site considerations

  • Obtain a boundary and topographic survey before drawing setbacks. Fences and aerial images are not reliable boundaries.
  • Measure the route from the street to the rear yard. Test construction access, emergency access, privacy, drainage and tree protection.
  • Locate sewer, water and electrical service. Ask providers about capacity and connection paths before assuming the existing house can supply another dwelling.
  • Have a qualified designer assess daylight, usable open space, roof drainage and how the new unit relates to the main house.
Needs verification

Planning & permitting questions

  • Ask the local planning department which additional-dwelling rules apply to the actual parcel, including setbacks, height, lot coverage and occupancy restrictions.
  • Verify overlays, easements, title restrictions, tree rules, historic status and hazard constraints. A generally applicable rule does not settle a parcel-specific question.
  • Confirm review steps, submittal requirements, utility approvals, applicable fees and any parking or fire-access requirements. No approval or timeline is assumed.
Illustrative assumptions · USD

A cost range you can unpack.

Detached 600 sq ft concept. Hypothetical US-dollar inputs chosen to demonstrate the method, not local market estimates or contractor quotes. Both endpoints use the same scope.

Hypothetical cost model, not a quote
ComponentLowHigh
Building construction: 600 sq ft × $300–$450$180,000$270,000
Site work and utility allowance$25,000$65,000
Design, studies and permit allowance$20,000$40,000
Subtotal$225,000$375,000
20% contingency$45,000$75,000
Illustrative total$270,000$450,000

A 20% contingency is applied to all three rows. It is a demonstration assumption, not evidence that the allowance is sufficient. The smaller concept requires its own estimate; costs do not scale evenly by floor area.

What this range excludes

Excludes land acquisition, finance costs, taxes, major off-site utility work, unusual foundation conditions, furnishings and rental operating costs. No rental income, return or value increase is forecast.

What could change the answer?

These are unresolved conditions, not small-print caveats.

Permission to build and rent

Could change the project entirely.

Where to investigate: Planning staff and title review.

Utility route and capacity

Could require a different layout or a larger budget.

Where to investigate: Utility providers and civil designer.

Actual buildable envelope

Could reduce the proposed floor area.

Where to investigate: Surveyor and qualified designer.

Local pricing and demand

Could make the project unattractive despite physical fit.

Where to investigate: Itemized contractor bids and verified rental comparables.

The next useful investigations

  1. Establish the parcel

    Collect the current title report, recorded map, survey if available, and existing permit history. Confirm these documents refer to the same property.

  2. Test the constraints

    Ask planning staff and utility providers targeted questions, then commission a measured site concept if no decisive barrier appears.

  3. Price a defined scope

    Obtain comparable itemized bids. Rework the budget, operating assumptions and alternatives before deciding whether to proceed.

A garden can suggest an opportunity. A measured building envelope, an approval path and a priced utility plan are what make that opportunity worth evaluating.

Evidence & limitations

Documented property information
None. No real property, record, site inspection, quote or official source underlies this fictional study.
Scenario assumptions
The property dimensions, proposed floor areas, diagrams, scope allowances and budget inputs were created by Insperer for illustration in November 2026. They are not market observations.
Items needing verification
Every parcel-specific condition, permission, cost, timeline, service connection and design implication. The investigations above identify where to begin, not a complete professional scope.

This example does not establish feasibility and is not a construction document, appraisal, survey, legal opinion or commitment to a price. Decisions about a real property may require local authorities and qualified professionals.

How future reports will handle evidence